Water Treatment
Pukete Water Treatment Plant
To accommodate all this new electrical infrastructure, Neo designed:
- A new 2500A switchboard MCC C/D for bioreactors 4,5&6, clarifiers 4,5&6, RAS PS and IPS PS
- A new switchboard and control cabinet for the chemical storage facility
- A new PLC node on the control network for MCC C/D and chemical facility
- Detailed electrical drawings for all new equipment (motor, instruments, valve, etc.)
- Detailed 3D BIM model for all cable routes
In addition, Neo interfaced with electricity network operator WEL on the installation of dual transformers from the existing MV ring main network.
Neo provided assistance during the tender and construction phases and evaluation to ensure a successful installation and project for HCC.
Our clients